 |
 |
 |
 |
|
ATV-2 on pad |
ATV-2 on pad just before launch |
Lift-off of the Ariane V carrying ATV-2 |
ATV-2 clearing the tower |
 |
 |
 |
 |
| Separation of the rocket
boosters |
Fairing Separation |
Sunrise during launch |
Stage 1 separation |
 |
 |
 |
 |
| ATV-2 on orbit |
ATV-2 deploying its solar
panels |
ATV-2 approaching the station |
ATV-2 docking with the station |
 |
 |
 |
|
| ATV-2 docked |
ATV-2 undocking |
The IOSS after ATV-2's
departure |
|